RO system running diagnosis: Judge the problems existing in the system operation such as unqualified water quality, increasing conductivity, reducing water recovery rate etc. Provide a reasonable solution to ensure safe and efficient operation of the system.
Reverse osmosis membrane cleaning to keep operation flux.
Reverse osmosis membrane replacing to keep product water quality.
Project location | An electricity factory in Inner Mongolia |
Project time | May 2011 |
Project condition | Raw water is groundwater. RO system run for nearly 3 years, Water flux dropped nearly 30% that could not meet the demand. |
Maintenance and service item | Online chemical cleaning and off-line checking the effectiveness of the membrane module. Keep the system flux and product water quality to meet the water demand. |